50 N. Fifth Street
5th Floor
Reading, PA 19601
610-375-9301
Fax: 610-375-9302 |
|
 |
|
 |
Liberty’s staff experience spans all environmental media. A sample listing is provided for environmental projects that have been managed and completed by our staff.
The following links provide a brief summary of past projects:
- Goggle Works Center for the Arts
- Industrial Wastewater Treatment Wetlands
- Pennsylvania Steel
- Laurel Center II
Multi-media Projects
- Enforcement assistance, economic evaluations, expert testimony for municipal and industrial clients.
- Environmental compliance audits at power generation facilities, schools, small businesses and industrial manufacturing sites.
- Track regulatory development, comment on proposed rules, participate in stakeholders negotiations, develop position papers on issues of concern.
- Develop and implement corporate-wide Environmental Management Systems (EMS) .
- Provide regulatory reporting assistance.
- Develop emergency planning procedures for local emergency response organizations.
Air Quality Projects
- MACT start-up, shut-down, and malfunction plan development.
- BACT, RACT and LAER studies and cost evaluations.
- Flexible permitting (e.g., PALs).
- Liaison with law firms – Title V permit negotiation, enforcement assistance, economic benefit analyses, supplemental environmental projects (SEPs).
- Air permitting such as Prevention of Significant Deterioration (PSD), New Source Review (NSR), Title V, and state construction permits for many U.S. based manufacturing facilities.
- NOx Budget Plans & NOx Averaging Plan development.
- Risk Management Plan (RMP) development.
- Toxics Release Inventories (TRI) development.
- Development of Compliance Assurance Monitoring (CAM) plans for particulate and volatile organic compound control equipment.
- Development of parametric and periodic monitoring plans.
- Development of source test plans and test protocols for compliance demonstration.
- Development of environmental QA/QC plans including Relative Accuracy Test Audits (RATA)

Land and Water Projects
- NPDES permitting, waste management, and integrated contingency plans.
- Remedial investigations at leaking underground storage tank and brownfield sites.
- Remediation system feasibility studies, design and construction.
- Industrial wastewater treatment system design and permitting.
- Stormwater management system evaluation and redesign.
- Develop and document industrial Waste Reporting forms.
- Soil and water sampling and analysis.
- Perform groundwater modeling.
- Design and perform aquifer testing (pump tests, slug tests and packer tests).
- Design, install and maintain groundwater monitoring wells (permanent wells, temporary well points, and piezometers).
- Perform Phase I and Phase II site surveys.
- Design, install and maintain groundwater pump and treat systems.
- Design, install and maintain in-situ bioremediation system.
- Develop approach and perform calculations for storm runoff .
- Perform pollutant load modeling.
- Design and permitting of waste management facility.
- Waste characterization and disposal management.
- Development of waste minimization plans and source reduction strategies.
- Contingency planning (e.g. SPR,SPCC).
- Landfill design, permitting, and construction.
- Storage tank installation permitting and inspections.
- Storage tank removals and closures.

Ecological Projects
- Conduct biological impact studies.
- Design, install and manage biological treatment for wetlands.
- Delineate wetlands and prepare mitigation and enhancement plans.
- Design and manage wetlands restoration.
- Perform phase I Bog Turtle surveys.
- Conduct biotic and abiotic sampling.
- Prepare environmental assessments for ecological and land use impacts.
- Preparation of joint permit applications for clean Water Act.
- Conduct flora and fauna inventories.

Engineering Projects
- Design, procure, permit, install, commission and demonstrate compliance for industrial air pollution control systems including fabric filters, mechanical filters, thermal oxidizers, wet scrubbers, catalytic oxidizers, and carbon adsorption systems.
- Design enhanced datalogging and PLC controls for continuous compliance demonstration.
- Fume capture and ventilation system design.
- Pollution prevention through process modifications and material recycling.
- Design and installation of Continuous Emission Monitoring Systems (CEMS) for carbon monoxide and particulate emissions.

|
|
|